With a listed operating speed of 600 m/min, this machinery offers substantial capacity for optical-fiber production. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.
Shanghai Weiye OFC provides a system engineered to manufacture 12- and 16-fiber rollable ribbons. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.
Begin by examining the stated equipment configuration, then ask the supplier for pricing, installation requirements, and project-specific alternatives. Doing so can clarify which specifications and options are relevant to your facility and production objectives.
The listed address for Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. is 201 Minyi Road, Songjiang District, Shanghai. Consider the product listing a preliminary information source, and confirm up-to-date specifications and commercial terms with the supplier. A detailed quotation request can help advance your equipment evaluation.
Intermittent Bonded Ribbon Fiber Coloring Machine Compact Fiber Unit
Important Points To Consider
- A speed of 600 m/min is listed, but buyers should verify the operating conditions with the manufacturer.
- The machinery is intended to manufacture rollable ribbons containing 12 or 16 fibers.
- The product listing describes machine capabilities, technical specifications, and supplied systems.
- Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
- The supplier provides a business address in Songjiang District, Shanghai.
Overview Of The Intermittent Bonded Ribbon Production Line
According to the supplier, the equipment is designed for rollable IBR configurations containing 12 or 16 fibers. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. Because these figures represent stated machine specifications, buyers should verify achievable speeds and operating conditions with the manufacturer.
Intermittent Bonded Ribbon Production Line
Equipment Designed For Twelve- And Sixteen-Fiber Rollable Ribbon Production
Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.
How Intermittent Bonding Supports Flexible Fiber Arrangement
According to examples in the patent, fibers are arranged in adjacent subunits with adhesive connections applied periodically. One illustrated spacing range extends from 10 mm to 1,000 mm. Unlike continuous bonding, this arrangement does not join the fibers along their entire length.
By spacing the bonds apart, the assembly can move between a mostly planar arrangement and a rolled, curled, or folded shape. These bond-spacing figures describe examples of the design approach and should not be interpreted as stated equipment settings.
- Machine details: 12 or 16 fibers, a stated speed of 600 m/min, and a diameter of Ф245 μm ±10 μm.
- Patent example: Illustrative spacing between adhesive bonds of 10 mm to 1,000 mm.
- Design benefit: Adaptable handling when the ribbon takes different shapes.
Uses In Optical Fiber Cable Manufacturing
Flexible ribbon arrangements can help cable designers balance access for splicing with compact cable packaging. The patent outlines a configuration that maintains fiber organization while allowing portions to move between adhesive connection points during cable assembly.
High Fiber Density And Compact Cable Designs
An optical fiber ribbon may remain flat during mass fusion splicing and subsequently fold or roll for installation in a smaller cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.
Organizing Fiber Ribbons To Support Efficient Fusion Splicing
This design supports orderly fiber handling during splicing while providing flexibility for subunit movement in the assembly process. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. These reel capacities can be compared with the facility’s cable-manufacturing needs and material-handling setup.
| Design characteristic | Possible application | Buyer consideration |
|---|---|---|
| Flat fiber configuration | Fusion splicing of multiple fibers | Verify the needs of your splicing process |
| Folded or rolled format | Compact cable packaging | Examine the complete cable design |
| Payoff reels with capacities of 25.2 km and 50.4 km | Planning material-handling operations | Align reel capacities with operating needs |
Production Line Specifications And Performance
Compare the equipment’s published performance figures with your manufacturing requirements before requesting a quotation. Installation preparations should also account for suitable reels and the utilities available at the production site.
Speed, Diameter, And Attenuation
According to the specifications, the construction speed reaches 600 m/min. The listed fiber diameter is Ф245 μm ±10 μm, with additional attenuation of ≤0.01 dB/km measured at 1550 nm. Confirm the measurement conditions and expected performance directly with the manufacturer.
Payoff And Take-Up Reel Compatibility
The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. For take-up, the equipment accepts either a T-type reel or a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.
Site Utilities And Environment
The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. Its specified operating environment is enclosed, clean, dry, and protected from drafts, with temperatures of 15 to 25°C and relative humidity no higher than 85%. Nitrogen must be supplied at 7 bar with 99.99% purity, together with compressed air at 6 bar. Verify the required utility connections before installation begins.
| Technical specification | Listed requirement | Installation planning note |
|---|---|---|
| Payoff reels | Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg | Check reel compatibility and maximum weight |
| Take-up reel | T-type reel: Φ410 × Φ50.8 × 391 mm, alternatively a fiber-optic reel | Confirm compatibility with your selected format |
| Electrical and environmental requirements | 380 V ±10%; 15 to 25°C; relative humidity ≤85% | Provide a clean, dry area without drafts |
| Gas supply | Nitrogen: 7 bar, 99.99% purity; air: 6 bar | Check available gas capacity before equipment setup |
Equipment For Fiber Payoff And Gathering
Optical fibers are guided toward the forming section by the payoff and gathering components. The associated controls help maintain a steady supply of fiber while reducing handling risks.
Sixteen-Spool Payoff With Tension Control
The active payoff accommodates 16 spools, incorporates traversing, and permits independent tension adjustment. The permitted weight for an individual spool is up to 10 kg. The technical details list 0.4 to 2 N tension with ±0.02 N accuracy, together with a 550 W motor. Another overview gives a range of 40 to 150 g and accuracy of ±2 g, so buyers should confirm which specification applies to their configuration.
Fiber Guidance, Break Detection, And Static Control
U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. A break-detection system and alarms notify operators when problems occur. Safe handling is supported by protective guards and a pneumatic clamping mechanism. A rod-type electrostatic dust collector is positioned at the fiber exit, and additional anti-static devices help control dust throughout the gathering path.
| Component | Specified details | Intended function |
|---|---|---|
| Fiber payoff assembly | Capacity for 16 spools, each weighing up to 10 kg | Feeds optical fibers with traversing movement |
| Tension and motor | 0.4 to 2 N with ±0.02 N accuracy; 550 W | Maintains controlled fiber payoff |
| Fiber guidance and safety features | Rollers with grooves, warning alarms, protective guards, and a pneumatic clamp | Guides fiber movement and assists material handling |
| Electrostatic management | Rod-type dust collector and anti-static equipment | Supports dust control along the fiber path |
Intermittent Adhesive Dispensing And Precision Molding
The ribbon-forming platform allows operators to control the mold position and placement of adhesive. Available adjustments help configure the process for each required ribbon format.
Ribbon Formation Using An Adjustable IBR Mold Platform
Ribbon formation uses three mold assemblies, each capable of holding up to five Nordson EFD jet valves. Operators can position the mold within 0 to 15 mm and adjust its base temperature from 20°C to 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.
Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production
For 12-fiber ribbons, the specified arrangement consists of 5+5+1 valves. The 16-fiber format is produced using a 5+5+5 valve layout. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. The process calls for a specialized adhesive suitable for both coating and curing.
| Process setting | Format With 12 Fibers | 16-Fiber Format |
|---|---|---|
| Dispensing valve layout | 5+5+1 valve configuration | 5+5+5 valve configuration |
| Mold positioning range | 0 to 15 mm adjustment | Adjustment range of 0 to 15 mm |
| Temperature of the mold base | 20°C to 60°C operating range | 20°C to 60°C operating range |
UV-LED Curing For Bonded Fiber Ribbons
The curing assembly applies UV exposure in stages to harden adhesive throughout the fiber structure. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.
Initial Pre-Curing And Main Curing Operations
Pre-curing is handled by three specialized 800 W LED-UV ovens. Fibers from each mold group pass through their respective pre-curing unit before entering the principal 6 kW post-curing oven. Adjustable shutters reduce potential UV leakage and nitrogen loss. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.
Managing Nitrogen Supply And Curing Performance
The nitrogen flow rate and pressure can be adjusted by hand. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Ask whether different adhesives or materials require adjustments to the settings.
Visual Inspection, Capstan Traction, And Take-Up
As fibers travel through the equipment, visual monitoring and steady winding support the maintenance of material quality. Buyers can use the listed specifications to assess whether the machine meets the demands of their cable manufacturing process.
Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement
A microscope and camera provide enlarged images in real time. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. By examining the optical fiber ribbon during production, operators can detect potential issues ahead of winding.
Servo-Driven Traction And Precision Take-Up
A 1 kW AC servo motor powers the capstan’s Φ190 mm traction wheel. The listed measurement accuracy exceeds 1‰. The adjustable tension range is 50 to 500 g, with control accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.
The specified take-up speed is 600 m/min, and the maximum spool weight is 30 kg. The servo-driven take-up and traversing assemblies support uniform positioning during winding. The cable pitch setting allows continuous adjustment from 1 to 6 mm. A photoelectric sensor monitors position and assists with reversing direction. Confirm that the operating conditions and settings are suitable for your target cable design with the supplier.
Production Monitoring And Electrical Control Systems
Accessible controls allow operators to adjust settings, check equipment status, and arrange orderly shutdowns. The supplier identifies Siemens control equipment and Schneider Electric switchgear as components of the production line.
Operating The Production Line Through PLC And Touchscreen Controls
Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Schneider Electric provides the low-voltage switching equipment. Operators may control the entire line with interlocked units or run individual sections independently.
Process Settings, Warning Alarms, And Preset-Length Shutdowns
Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.
Operators can program a target production length that triggers deceleration or shutdown. The function supports managed stopping as a cable manufacturing run reaches its planned length. Verify the available controls and configuration requirements with the supplier before purchasing.
| Control-system feature | Listed detail | Use |
|---|---|---|
| PLC controls and operator display | Siemens S7-1200/S7-1500; 10.4-inch touchscreen | Configure settings and examine production data |
| Electrical components | Low-voltage switchgear from Schneider Electric | Provides support for system control |
| Equipment monitoring and shutdown control | Lamp, oven, runtime, and meter information with preset length | Track operating conditions and initiate machine stopping or slowing |
Materials, Process Compatibility, And Ribbon Quality
Adhesive selection affects both the consistency of coating application and the final product. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.
Dedicated Adhesive For Bonding And Curing
The pressure-fed adhesive system provides independent valve switches so each supply path can be opened or closed as required. Precision pressure-regulating valves help maintain controlled adhesive delivery at each dispensing location. Air pressure can be regulated but must remain at or above the listed minimum of 0.5 MPa.
Black adhesive supply tubing helps protect the material from reactions caused by UV exposure during operation and curing. Preventing unintended exposure matters because adhesive behavior could be affected before the material reaches the fiber surface.
Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Ask how the recommended adhesive performs under your intended application conditions and expected production length. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.
Equipment Installation Needs And Supplied Documentation
Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.
Facility Conditions And Buyer-Supplied Connections
The machine should be positioned inside a draft-free, enclosed workspace that is clean and dry. Keep the operating area between 15 and 25°C, with humidity at or below 85%. Provide nitrogen at 7 bar and 99.99% purity, along with compressed air at 6 bar.
The equipment package does not include connecting cables or cable trays. The purchaser is responsible for supplying the main incoming power cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.
Operating Manuals, Drawings, And Maintenance Information
Documents covering installation, equipment use, and maintenance are provided by the manufacturer. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.
- Operating and instruction manuals together with the overall equipment layout drawing
- Electrical schematics, wiring diagrams, and drawings for installation and maintenance
- Purchased-component instructions and a wear-parts list to support service preparation
The supplied records support preparation for commissioning and routine servicing of the cable production machinery.
Choosing A Ribbon Production Line For Your Manufacturing Needs
First determine which finished ribbon products your business plans to offer. This production line is designed for 12F and 16F options, with a listed construction rate of 600 m/min. Compare those specifications with your expected product mix, production targets, and anticipated cable demand.
Before purchasing the machine, confirm that its take-up arrangement matches your requirements. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Check that these specifications suit your production facility and material-handling operations.
Payoff reel compatibility also deserves attention. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.
Evaluate utilities, adhesive requirements, and operator-monitoring capabilities alongside production speed. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. Checking equipment suitability in advance can reduce the likelihood of costly changes after purchase.
| Planning point | Listed detail | Required buyer verification |
|---|---|---|
| Formats and speed | 12F, 16F; specified speed of 600 m/min | Compare with target production and product mix |
| Take-up | 30 kg maximum capacity; adjustable pitch from 1 to 6 mm | Check reel compatibility and facility requirements |
| Fiber payoff reel options | Capacities of 25.2 km, 50.4 km, and 63 km | Verify exact spool dimensions |
How To Request A Quotation For The Intermittent Bonded Ribbon Production Line
U.S. buyers can evaluate a system offering 12F and 16F formats, a specified construction rate of 600 m/min, and specialized optical fiber ribbon-forming equipment. Use these specifications to determine whether the machine is appropriate for your intended cable application.
A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Also describe the fiber type and handling requirements so Shanghai Weiye can evaluate the proposed configuration.
Confirm the suitability of the adhesive, the LED wavelength specification of 395 nm ±3 nm, and expected curing results before purchasing. Discuss how the stated specifications affect your intended material and finished surface-quality objectives.
Consult the product page for the published equipment description. Verify the final configuration, shipment details, and installation commissioning with Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. Telephone 021-60701630 to discuss your manufacturing requirements. A detailed quotation inquiry helps define the next steps in purchasing.